110
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
Note –
Install cable shelves only as they are needed. If all cable shelves are installed
before the switch is cabled, the shelves’ presence makes cabling difficult.
4. Plug the first cable into the CXP connector at 11B.
Note –
For each connector group, A is the upper connector, B is the lower connector.
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...