Installing the Switch
45
Inspecting the Components
After mounting the switch chassis into the rack, check the condition and suitability of
the components for installation. Perform the tasks in the following order:
Related Information
■
“Understanding the Installation” on page 15
■
“Verifying the InfiniBand Fabric” on page 119
Inspecting the Midplane for Installation
Verify that the midplane is suitable for fabric card and line card installation. Perform
the tasks in the following order:
Step
Description
Links
1.
Inspect the midplane.
“Inspecting the Midplane for Installation”
on page 45
2.
Inspect the fabric cards.
“Inspecting the Fabric Cards for
Installation” on page 51
3.
Inspect the line cards.
“Inspecting the Line Cards for Installation”
on page 55
4.
Inspect the InfiniBand cables.
“Inspecting the InfiniBand Cables for
Installation” on page 61
Step
Description
Links
1.
Identify the midplane fabric card
connectors.
“Identify the Midplane Fabric Card
Connectors” on page 46
2.
Inspect the pins on the rear side of
the midplane.
“Inspect the Pins on the Rear Side of the
Midplane” on page 47
3.
Identify the midplane line card
connectors.
“Identify the Midplane Line Card
Connectors” on page 48
4.
Inspect the pins on the front side of
the midplane.
“Inspect the Pins on the Front Side of the
Midplane” on page 50
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...