13
SECTION 2
Mounting
This chapter describes how to mount the VSD.
Before mounting it is recommended that the installation is planned out first.
•
Be sure that the VSD suits the mounting location.
•
The mounting site must support the weight of the VSD.
•
Will the VSD continuously withstand vibrations and/or shocks?
•
Consider using a vibration damper.
•
Check ambient conditions, ratings, required cooling air flow, compatibility
of the motor, etc.
•
Know how the VSD will be lifted and transported.
2-1
Lifting instructions
Note
To prevent personal risks and any damage to the unit during lifting, it is
advised that the lifting methods described below are used.
Models 4090 to 4132 and 6090 to 6250
Fig. 3 Lifting model 4090-4132 and 6090-6250
Load: 56 to 74 kg
Содержание SX-F
Страница 2: ......
Страница 14: ...6 Table of contents...
Страница 20: ...12 Glossary Section 1 6...
Страница 32: ...24 Cabinet mounting Section 2 3...
Страница 58: ...50 Connecting options Section 5 6...
Страница 72: ...64 Load Monitor and Process Protection 400 Section 7 5...
Страница 74: ...66 EMC standards Section 8 1...
Страница 266: ...258 System Data 900 Section 11 9...
Страница 274: ...266 Maintenance Section 12 3...
Страница 284: ...276 Liquid cooling Section 13 12...