174 Chapter 11 Initial switch hardware installations
241-1501-240 5.2S2
•
For the installation of the Passport 15000 or 20000 switch to begin, the
23-inch EIA rack must already be completely installed and anchored.
•
Typically, the weight of a fully provisioned and fully installed
Passport 15000 prohibits adding other equipment to a rack. Install the
equipment that connects to the switch hardware in a different mounting
apparatus as described in:
— “Installing a fanout panel” (page 463)
— “Installing a sparing panel” (page 532)
— “Peripheral equipment” (page 183)
•
You must not install a second switch in a mounting apparatus other than
a NEBS 2000 frame because of the total installed weight or cooling
requirements. See 241-1501-205 Passport 15000, 20000 Site
Requirements and Preparation Guide for the criteria involved with
installing a shelf-based switch.
•
The Passport 15000 or 20000 switch must always be positioned in the
lowest possible part of your rack.
•
The optional extended cable management brackets cannot be used with
the adapter brackets.
•
The optional hardware kits NTQS37AA, NTQS37AB, or NTPX4050
should not be used for a mounting apparatus other a NEBS 2000 frame.
•
See “Planning for the use of an equivalent mounting apparatus” in
241-1501-205 Passport 15000, 20000 Site Requirements and
Preparation Guide for additional information.
Passport 15000 or 20000 switch installation into a 23-inch EIA
rack task flow
This task flow shows the sequence of procedures and tasks you do to install a
Passport 15000 or 20000 into a 23-inch EIA rack. To link to any procedure or
task, go to “Task flow navigation” (page 176).
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......