
Chapter 16 Sparing and fanout panels 225
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Figure 57
Task flow of a sparing panel replacement
Yes
No
Yes
No
Sparing panel
replacement
End
Removing a
sparing panel
Installing a
sparing panel
Temporarily
disabling an LP
Connecting an FP
cable
Re-enabling
an LP
Assembling
sparing panel
NTQS31
(if necessary)
12-port DS3 or
E3 sparing
panel?
Testing sparing
panel connectivity
(optional)
All LPs in sparing
configuration
disabled?
PP_TASK_1055.ins
For procedure page
numbers, see
Task flow navigation
below
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......