
274 Chapter 17 Hardware procedures
241-1501-240 5.2S2
Procedure job aid
Figure 72
Power cable paths between the BIP and two shelves
PPT 2822 001 AC2
S3
S2
S1
Upper cooling unit
Lower
cooling unit
Power A
Power B
Alarm
A1
B1
A2
B2
Alarm
Alarm/BITS
BIP
P15
P17
P21
P23
P18
P20
P24
P26
P16
P22
P19
P25
NTHR53
power cables,
upper shelf
NTHR54
power cables,
lower shelf
PIMs
PIMs
NTHR66
2 cooling unit
power cable
assemblies
Power A Power B
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......