
306 Chapter 17 Hardware procedures
241-1501-240 5.2S2
Procedure job aid
Figure 79
Connection points of the PIM cables
Upper shelf
A2.4 & A2.5
B2.4 & B2.5
A2.1 & A2.2
B2.1 & B2.2
Top
Bottom
Upper (front)
cooling unit
Lower (rear)
cooling unit
A2.3
B2.3
A1.3
B1.3
Lower shelf
A1.4 & A1.5
B1.4 & B1.5
A1.1 & A1.2
B1.1 & B1.2
Top
Bottom
PPT 2820 014 AA2
Lower shelf
Upper shelf
BIP
B1.1 & B1.2
B1.3
B1.4 & B1.5
A1.1 & A1.2
A1.3
A1.4 & A1.5
A2.4 & A2.5
A2.3
A2.1 & A2.2
B2.4 & B2.5
B2.3
B2.1 & B2.2
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......