Chapter 13 Peripheral equipment 191
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Shasta 5000 installation task flow
This task flow shows the sequence of procedures you do to install a
Shasta 5000 in your Passport switch. To link to any procedure, go to “Task
flow navigation” (page 192).
Figure 48
Task flow of a Shasta 5000 installation
Shasta 5000
installation
End
Unpacking a Shasta 5000
Installing an air-flow grill for Shasta 5000
Installing a Shasta 5000 shelf assembly
Installing a Shasta 5000 cable management assembly
Installing a Shasta 5000 filler panel
Preparing the NEBS 2000 frame for installing adapter brackets
Installing adaptor brackets onto the Shasta 5000
Grounding a Shasta 5000 to a NEBS 2000 frame
Removing a door
(if present)
Installing a door
(if required)
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1060
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......