
Chapter 17 Hardware procedures 233
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
to center the rod in the oval opening, then keeping the rod vertical is
more important.
11 For each remaining oval opening that does not have an anchor rod
passing through it, fasten a plate over the opening so that no gap appears.
The plates are square with a screw hole in one corner. The frame base
has a screw hole beside the inner oval openings. Fasten each plate using
a provided thread-forming 10-mm (3/8-in.) hex-head screw.
12 Starting at a middle anchor (if any) and moving outwards in a spiral,
tighten all nuts.
For M12 anchors, torque each nut to 78 Nm (58 lbs-ft) using an 18-mm
(23/32-in.) 6-point deep socket.
For 10-mm (3/8-in.) anchors, torque each nut to 48 Nm (36 lbs-ft) using a
16-mm (41/64-in.) 6-point deep socket.
13 After fastening the anchors, the levelling feet may no longer touch the
floor. Check each levelling foot to ensure it touches the floor. If not, tighten
each until it touches, then tighten a 1/4 turn more.
You may need to level the frame again by unfastening the anchor nuts,
adjusting the levelling feet, and re-fastening the anchor nuts.
14 Under the floor tiles, thread each 18-mm (23/32-in.) nut up the rods until
the washer is snugly against the underside of the floor tile, as shown in
the figure “Anchoring to a raised floor” (page 235). Then tighten each nut
another 1/4 turn.
15 Fasten each kick plate back on the frame base.
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......