
Chapter 17 Hardware procedures 317
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Figure 84
Locations of the alarm cable connectors and paths
PPT 2822 001 AD2
S3
S2
S1
Upper cooling unit
Lower
cooling unit
Sync. A J4
Sync. B J3
Cooling unit alarm J2
BIP alarm J1
Sync. A J4
Sync. B J3
Cooling unit
Alarm J2
BIP alarm J1
Alarm/BITS
BIP
Power A
Temperature
sensor
Power B
Pwr A
Pwr B
Alarm
Temperature
sensor cable
NTHR57
2 cooling unit
alarm cable
assemblies
Alarm
NTHR56
BIP alarm cable,
lower shelf
NTHR55
BIP alarm cable,
upper shelf
P1
P3
P4 J3 J2 J1
P2
P10
P9
P8
P7
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......