
Chapter 17 Hardware procedures 335
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
21 Tighten each stud nut to 6.5 Nm (57.5 in.-lbs). Use a properly calibrated
torque wrench with the measurement near the middle of wrench’s range.
22 Slide the insulating boot to the BIP end of the cable and align it with the
shape of the lug (toe upwards). Rest the boot flush against the rear of the
BIP. The boot retainer clamp will be fastened in a later procedure after
testing the installation of the power cables.
23 Dress the cable by
•
fastening it to the strain relief bar at the point perpendicular to the
insulation boot; consider that other cables will be nesting against the
cable and bar
•
balancing the slack up to the other end
•
tightening the tie-wraps up to the other end
•
cutting off the tie-wrap tails
24 Locate the adjacent cable by its label as indicated in the figure “Overhead
power input cables for the lower shelf connected to the BIP” (page 337).
25 Repeat step 1 to step 24 for each of the remaining 3 or 7 power input
cables. Adjust each cable label.
CAUTION
Risk of damage to power connections
At the rear of the BIP, the top stud of each pair carries the
power. The bottom stud prevents rotation of the lug from
the weight of the power cable. To avoid arcing and
rotation, ensure both studs are fastened securely with the
provided 2-hole lug.
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......