168 Chapter 11 Initial switch hardware installations
241-1501-240 5.2S2
Parts installation in a Passport 20000 in a NEBS 2000 frame
Install the parts of a Passport 20000 that is mounted in a NEBS 2000 frame
to enable the switch to be put into service.
•
“Prerequisites to parts installation Passport 20000 into a NEBS 2000
frame” (page 168)
•
“Parts installation of a Passport 20000 in a NEBS 2000 frame task flow”
(page 168)
Prerequisites to parts installation Passport 20000 into a NEBS
2000 frame
•
The NEBS 2000 frame must already be installed as indicated by “NEBS
2000 frame installation” (page 161).
•
Power and ground cables must be routed to the planned location of the
Passport prior to beginning this task. See the 241-1501-205 Passport
15000, 20000 Site Requirements and Preparation Guide.
Parts installation of a Passport 20000 in a NEBS 2000 frame
task flow
This task flow shows the sequence of procedures you do to install a
Passport 20000. To link to any procedure, go to “Task flow navigation”
(page 170).
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......