Chapter 11 Initial switch hardware installations 161
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
NEBS 2000 frame installation
Install a NEBS 2000 frame to unpack, place, and anchor it onto its footprint.
•
“Prerequisites to NEBS 2000 frame installation” (page 161)
•
“NEBS 2000 frame installation task flow” (page 162)
Prerequisites to NEBS 2000 frame installation
•
You need a NEBS 2000 frame with PEC NTRU04. The frame is also
known as a PTE 2000 frame.
•
In 241-1501-205 Passport 15000, 20000 Site Requirements and
Preparation Guide, ensure that you have addressed all of the planning
considerations, especially:
— where to locate the frame and any peripheral equipment that will be
connected to the switch hardware
— whether the frame will be joined to an adjacent frame with or
without the optional extended management brackets
— which cable management brackets you need to install to
accommodate high density combinations of fiber, coax, and/or mini-
coax cables, or very high cable densities of coax and/or mini-coax
cables
WARNING
Risk of injury or damage by an unanchored rack
Mounting equipment into or onto a frame can make it top
heavy. To prevent a frame from tipping over, possibly
causing a serious injury, always anchor it to the floor.
WARNUNG
Verletzungs- oder Beschädigungsrisiko durch ein
unverankertes Rack
Beim Montieren von Geräten in oder auf einem Rack
besteht die Gefahr der Kopflastigkeit. Verankern Sie ein
Rack immer am Boden, um ein Umkippen und dadurch
verursachte mögliche Verletzungen zu vermeiden.
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......