210 Chapter 14 Power-and-ground hardware of a Passport 15000 or 20000
241-1501-240 5.2S2
Powerup of a Passport 15000 or 20000
Power up a Passport 15000 or 20000 to enable the switch hardware to be
downloaded with software for initial operation or to return the system to
operation.
•
“Prerequisites to powerup of a Passport 15000 or 20000” (page 210)
•
“Powerup of a Passport 15000 or 20000 task flow” (page 211)
Prerequisites to powerup of a Passport 15000 or 20000
•
You need access to 241-5701-270 Passport 7400, 15000, 20000 Software
Installation Guide.
•
All cables must be installed for interworking equipment, signalling
(traffic), timing, and alarms.
•
All power cables must be installed from the breaker interface panel (BIP)
up to the power source without being connected and must have passed the
checks with the power off.
•
All equipment that is connected to or interworking with the
Passport 15000 or 20000 must share the same site ground window.
•
Each Passport sparing panel will be powered up from the function
processor (FP) cards through the control port cable when at least one FP
is powered up.
•
The following interworking equipment can be powered up independently
from the BIP, but needs to be on to verify operation of the system:
— an EdgeLink 100 DS3 multiplexor
— the hardware of a Preside Multiservice Data Manager (MDM)
— a local operator terminal and its modem (if present)
— a multiport aggregate device
— the Passport 7400 of a Passport 15000-VSS
— a Shasta 5000 that shares a NEBS 2000 frame with a Passport 15000
or 20000
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......