
Chapter 6 Control processors 97
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
CP upgrade task flow
This task flow shows the sequence of procedures you do to upgrade CPs in
your Passport switch. To link to any procedure, go to “Task flow navigation”
(page 97).
Figure 12
Task flow of a CP upgrade
Task flow navigation
The following references are listed alphabetically:
•
•
•
“Switching between active and standby processor cards” See
241-5701-600 Passport 7400, 15000, 20000 Configuration Guide.
No
Yes
CP upgrade
End
Removing a CP
Installing a CP
Switching between
active and
standby
processor cards
all CPs
upgraded?
PP_TASK_1058.ins
For procedure page
numbers, see
Task flow navigation
below
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......