Chapter 5 CP and FP cables 87
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Figure 9
Task flow of cable routing
High density
Low density
Fiber
Coax
High density
Very high density
Cable routing
Routing FP
cables
Installing high-
density cable
management
brackets
End
Are you
using fiber
or coax
cables?
Are you
routing
high- or
low-density
cables?
Routing FP
cables
Installing
extended cable
management
brackets
Installing fiber
cables through the
fiber management
unit (optional for
fiber cables)
Installing high-
density cable
management
brackets
Is the
volume of
coax cables
high- or
very high-
density?
PP_TASK_1096.ins
For procedure page
numbers, see
Task flow navigation
below
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......