
148 Chapter 10 Function processors
241-1501-240 5.2S2
Figure 35
Task flow of an optical FP upgrade
Unspared
No
Spared
Inter-card (dual-FP) LAPS
Intra-card (single-FP) LAPS
Yes
Optical FP
upgrade
Unlocking a
function
processor
Locking a function
processor
Unlocking a
function
processor
Locking a function
processor
Have you
upgraded both
FPs?
Spared
configuration?
Configuring a new
processor card
Configuring a new
processor card
Removing an FP
Installing an FP
Removing an FP
Installing an FP
Connecting an FP
cable
Connecting an FP
cable
End
Activating
configuration
changes
Activating
configuration
changes
Inter-card LAPS
or Intra-card
LAPS?
Configuring a port
to use an SFP
optical module
(if present)
Configuring a port
to use an SFP
optical module
(if present)
PP_TASK_1046.ins
For procedure page
numbers, see
Task flow navigation
below
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......