190 Chapter 13 Peripheral equipment
241-1501-240 5.2S2
Shasta 5000 installation
Install a Shasta 5000 into a NEBS 2000 frame for interworking with
Passport 15000 or 20000.
•
“Prerequisites to Shasta 5000 installation” (page 190)
•
“Shasta 5000 installation task flow” (page 191)
Prerequisites to Shasta 5000 installation
•
Determine if the floor can accommodate the combined weight of both the
Shasta 5000 and the Passport 15000 or 20000. The combined weight of
two fully provisioned nodes will be approximately 568 kg (1,252 lbs).
Aside from this consideration, the normal site preparations of a
Shasta 5000 apply to the installation.
•
You will need the hardware kit NTHW85 required to add a Shasta 5000
to a NEBS 2000 frame. The kit contains
— a pair of adapter brackets (P0914660 for the right and P0914659 for
the left) to mount a Shasta 5000 onto a NEBS 2000 frame
— an air-flow grill (P0914658) for the front space between the two
nodes
— a cable management assembly to be installed above the Shasta 5000
— self-tapping mounting screws with 10-mm (3/8-inch) hex heads
•
You will need drivers for 10-mm (3/8-inch) hex-head screws.
•
Before installing a Shasta 5000 switch into a NEBS 2000 frame
(NTRU04), the frame must already be installed and anchored to the floor,
with a Passport 15000 or 20000 switch in its lower half.
•
You must supply power and ground cables, and any signalling cables.
•
After installing the Shasta 5000 hardware into the NEBS 2000 frame,
follow the appropriate procedures in S-623-01 Shasta 5000 BSN
Installation and Maintenance Manual to complete the installation of the
Shasta 5000 (for example, installing cards and cables, power and alarm
cabling, and powering up).
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......