
694 Chapter 17 Hardware procedures
241-1501-240 5.2S2
6
With 4 helpers, lift the top of the frame until the frame feet touch the floor.
While tilting:
•
ensure neither the frame feet nor the pallet slides along the floor
•
avoid allowing the full weight of the frame to sit on the levelling feet
•
ensure the feet gently touch the floor
7
When the frame is vertical, move the fridge cart beside one side of the
frame so that the foot plate touches the frame feet. Put the cart at the side
of the frame with the least amount of cabling. A side is a full-height flat
metal surface. Ensure the secondary feet are extended and locked into
position.
8
If the frame has panels fastened over the sides, remove one by prying the
8 screw caps off and unfastening the large slotted screws. Put the panel,
caps, and screws aside for re-use later.
WARNING
Risk of injury when handling a frame
Never place a foot or a hand under any part of the frame
while it is being tilted or moved. Always move it with at
least four people. The weight of a shipped frame with one
Passport 15000 or 20000 switch is approximately from
330 kg (730 lbs) to 355 kg (780 lbs); with two switches
the weight is from approximately 480 kg (1052 lbs) to
490 kg (1076 lbs). For additional protection, wear safety
boots with steel toes and gripping soles.
WARNUNG
Verletzungsgefahr beim Gestelltransport
Stellen Sie niemals einen Fuß unter das Gestell, wenn
dieses bewegt oder gekippt wird, und greifen Sie nicht
unter das Gestell. Zum Bewegen des Gestells sind
mindestens vier Personen erforderlich. Ein Gestell mit
einem Passport 15000 oder 20000 wiegt ca. 330 kg und
mit zwei Passport-Einheiten ca. 490 kg. Tragen Sie zu
Ihrem zusätzlichen Schutz Sicherheitsschuhe mit
Stahlkappen und griffigen Sohlen.
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......