
Chapter 11 Initial switch hardware installations 173
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Passport 15000 or 20000 switch installation into an EIA rack
Install Passport 15000 or 20000 switch hardware into a standard 23-inch EIA
frame, equipment rack, or enclosed cabinet.
•
“Prerequisites to Passport 15000 or 20000 switch installation into a
23-inch EIA rack” (page 173)
•
“Passport 15000 or 20000 switch installation into a 23-inch EIA rack
task flow” (page 174)
Prerequisites to Passport 15000 or 20000 switch installation
into a 23-inch EIA rack
•
You need one of these switch hardware packages:
— NTQS04 for a Passport 15000
— NTQH04 for a Passport 20000
•
When you install Passport 15000 or 20000 switch in a mounting
apparatus other than a NEBS 2000 frame, you are responsible for making
the setup compliant to earthquake standards. Refer to the rack
manufacturer’s installation instructions.
WARNING
Risk of injury or damage by an unanchored rack
Mounting equipment into or onto a rack can make it top
heavy. To prevent a rack from tipping over, possibly
causing a serious injury, always anchor it to the floor.
Follow the methods prescribed by Zone 2 or 4 anchoring.
WARNUNG
Verletzungs- oder Beschädigungsrisiko durch ein
unverankertes Rack
Beim Montieren von Geräten in oder auf einem Rack
besteht die Gefahr der Kopflastigkeit. Verankern Sie ein
Rack immer am Boden, um ein Umkippen und dadurch
verursachte mögliche Verletzungen zu vermeiden. Folgen
Sie den Anweisungen zur Verankerung in Zone 2 oder 4.
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......