
212 Chapter 14 Power-and-ground hardware of a Passport 15000 or 20000
241-1501-240 5.2S2
Figure 54
Task flow of a power-up of a Passport 15000 or 20000
Yes
No
Powerup of a
Passport
15000 or
20000
Is the power
source a system
of ac rectifiers?
End
Checking the
operation of
external alarms
Checking the
power output from
a system of ac
rectifiers
Powering up a
system of ac
rectifiers
Connecting power
output cables to a
system of ac
rectifiers
Testing the power
to the BIP
Checking the
connectivity
between FPs and
sparing panels
(as required)
Checking the final
status of all LEDs
Switching on the
BIP circuit
breakers
Software
installation work
flow
Loading cards in
sequence with
software
Card testing
(optional)
PP_TASK_1073.ins
For procedure page
numbers, see
Task flow navigation
below
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......