
Chapter 13 Peripheral equipment 189
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Figure 47
Task flow of a multiport aggregate device replacement
Task flow navigation
The following references are listed alphabetically:
•
“Installing a door” (page 407)
•
“Installing a multiport aggregate device” (page 478)
•
“Locking a port”. See 241-5701-600 Passport 7400, 15000, 20000
Configuration Guide.
•
•
“Removing a multiport aggregate device” (page 704)
•
“Unlocking a port”. See 241-5701-600 Passport 7400, 15000, 20000
Configuration Guide.
No
Yes
Multiport aggregate device
replacement
End
Removing a multiport
aggregate device
Installing a multiport
aggregate device
Unlocking a port
Locking a port
Is the device
mounted behind a
door in a NEBS 2000
frame?
Installing a door
(if required)
Removing a door
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1062
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......