166 Chapter 11 Initial switch hardware installations
241-1501-240 5.2S2
Figure 40
Task flow of parts installation in a Passport 15000 in a NEBS 2000 frame
BIP power-and-ground
cable installation
Installing a CP
Peripheral
equipment
Powerup of a
Passport 15000 or
20000
Parts installation in a
Passport 15000 in a
NEBS 2000 frame
End
Installing an FP
Installing a fabric
card in a
Passport 15000
Installing a fanout
panel
(if necessary)
Installing a BITS
cable
Connecting a CP
local operator
terminal cable
Installing a
sparing panel
(if necessary)
Cable routing
Connecting an FP
cable
Installing a blank
processor card
(as required)
Removing a side frame
panel, regular or extended
sizes (if present)
Installing front or
rear frame panels
(if required)
Side frame panel
installation
(if required)
Installing a shelf
filler panel
(optional)
Door
installation
(if required)
Removing front or
rear frame panels
(if present)
For procedure page
numbers, see
Task flow navigation
below
PP_TASK_1082
Содержание Passport 15000
Страница 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Страница 2: ......
Страница 4: ......
Страница 6: ...6 Publication history 241 1501 240 5 2S2 ...
Страница 32: ...32 Contents 241 1501 240 5 2S2 ...
Страница 48: ...48 About this document 241 1501 240 5 2S2 ...
Страница 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Страница 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Страница 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Страница 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Страница 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Страница 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Страница 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Страница 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Страница 873: ......