Test equipment required
11-5
Wireless Solutions
DualMode 800 Enclosure
Maintenance Manual
MTX08
Whenever a test is performed on a DRU, record the test parameter. You
should test only one DRU at a time. Unless specified elsewhere, testing
should be carried out within the +15
°
C (+59
°
F) to +35
°
C (+95
°
F)
temperature range.
Power and Ground Verification (Chapter 4), Master Oscillator Testing and
(Chapter 5) may be required before conducting some DRU tests.
Test equipment required
Proper setup of the test equipment is critical in obtaining proper test results.
Consistency of setup and techniques from one person to another is essential
for obtaining proper system operation.
It is assumed that the operator is familiar with the test equipment used in the
test procedures. The following test equipment is recommended for
performing the tests. Any functionally equivalent unit may be used in its
place. Double shielded coaxial cables are recommended for use between test
equipment and the cell site equipment being tested.
Note: Ensure that all test equipment is calibrated before use. Cable loss
must be accounted for in the MCPA RF output power tests.
For a list of the required test equipment, refer to Chapter 3, Test Equipment
and Precautions, in this manual.
This section describes the tests that can be performed on a DualMode Radio
Unit (DRU). These tests can be used to verify the performance of a DRU but
they are not required on a periodic basis.
Note: The DRU, the ICRM and the test equipment should be powered up
for at least half an hour before the tests. Inaccurate measurements may
result if the warm-up period is less than 30 minutes.
A VT100 Video Display Terminal (or equivalent) is required to perform the
tests. Refer to the Test Equipment section in Chapter 3, Test Equipment and
Precautions, for setting up the parameters of the terminal. For a complete list
of the Terminal Interface commands, refer to the Transmit Receive Unit
section in Chapter 1, Equipment operation.
TRU self test
A built-in self test can be performed on a TRU (EEPROM CRC check for a
TRU2 and a CRC check for a TRU3).
Use the following procedure to perform the self test:
1. Connect the interface terminal to the RS-232 port on the front panel of the
TRU under test.
Содержание DualMode 800
Страница 2: ......
Страница 4: ......
Страница 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Страница 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Страница 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Страница 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Страница 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Страница 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Страница 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Страница 215: ......