9-4
Performing tests using a DCSM
411-2051-500
Draft
00.01
November 1999
Posting the DCSM
To use the DCSM to perform tests requires that the DCSM is in service
(INSV) state. The DCSM can be posted before a test is initiated from the
Maintenance and Administration (MAP) terminal (see Procedure 9-1).
Control Channel tests
The Digital or Analog Control Channel can be monitored and tested using the
DCSM located in the same partition in which the DCCH/ACCH serves.
The following tests are available from the MTX MAP position.
CCH MAP level:
•
forward DCCH/ACCH RF power measurement (POWER)
•
reverse DCCH/ACCH RF power measurement (RSSI)
•
ACCH Overhead Message Train monitoring (CCHOMT)
•
DCCH F-BCCH and E-BCCH parameter reporting (DCCHPARM)
CTU MAP level:
•
Background round robin monitoring (MON)
Procedure 9-1
Posting the DCSM
Step
Action
Observation
1
At the MAP terminal, post the DCSM by entering:
>MAPCI;MTC;MTX;CELL <cell_number>
>CTU;POST <DCSM_number>
2
Ensure that the posted DCSM is in the INSV (in service) state. If
not, place the DCSM to the INSV state by entering:
>
BSY;RTS
Содержание DualMode 800
Страница 2: ......
Страница 4: ......
Страница 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Страница 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Страница 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Страница 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Страница 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Страница 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Страница 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Страница 215: ......