2-14
Periodic maintenance
411-2051-500
Draft
00.01
November 1999
DualMode 800 Enclosure MONTHLY Checklist
Date:
____________________________
Performed by:
___________________________
1
Perform the EVERY VISIT routine checks
Power - Battery
2
Check the battery voltages and note any discrepancies.
3
Check terminals, connectors for signs of moisture or corrosion
Power - BCM
4
Check that the BCM output voltage is within specification
Housekeeping
5
Mop the floors at least once a month to keep dust levels to a minimum
Содержание DualMode 800
Страница 2: ......
Страница 4: ......
Страница 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Страница 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Страница 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Страница 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Страница 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Страница 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Страница 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Страница 215: ......