9-2
Performing tests using a DCSM
411-2051-500
Draft
00.01
November 1999
2. scroll to the ScnDCCH field
— if you want to verify the ACCH set ScnDCCH to 0 or
— if you want to verify the DCCH set ScnDCCH to 1
Note: In ScnDCCH mode you should set the field 1STDCCH to the
channel number of the DCCH you wish to perform the call through test
on. If you have a sectored site you must repeat the NAM programming for
each specific DCCH you wish to perform the stand-alone call through
test.
DCSM auto answer facilities
In both the directed or stand-alone modes the DCSM will automatically
answer all incoming calls. If the incoming call uses an analog call resource
(AVC), the DCSM will generate a 1004 Hz tone for five seconds on the
reverse path. The forward audio will then be looped to the reverse audio for
the remainder of the call. If the incoming uses a TDMA call resource (DTC),
the DCSM will automatically answer the incoming call, but will not generate
a tone, or loop the forward and reverse audio paths.
Nortel Networks recommends that the MRLT, MRHT, MRLP and MRLR
VCH tests be used for verifying the performance of analog voice channels.
Performing tests using the DCSM in the directed mode
The directed-mode tests using the DCSM can be further divided into two
categories:
•
MTX trunk tests
•
Control channel tests
Control channel testing uses the DCSM to monitor the Overhead Message
Train (OMT) on the ACCH and the FBCCH and EBCCH sub channels on a
DCCH. A site control channel can also be tested for its power level in both the
forward and reverse direction.
MTX trunk tests use the DCSM mobile as a loop-around to measure various
indicators of the trunk path performance. Specifically the RF performance of
the DUT can be measured by advantageously using the parameters of Table
CTTPARMS.
Monitoring functions
With the MON ON command from the CTU MAP level, you may enable the
ICP to drive the periodic CCH audit order function. Command parameters
specify if a cell or a particular cell/sector is to be monitored. You must also
Содержание DualMode 800
Страница 2: ......
Страница 4: ......
Страница 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Страница 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Страница 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Страница 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Страница 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Страница 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Страница 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Страница 215: ......