9-14
Performing tests using a DCSM
411-2051-500
Draft
00.01
November 1999
Figure 9-5
MRLT Test Output MTX303 Log
Refer to the DualMode 800 Enclosure Troubleshooting Guide, 411-2051-900,
for more information of the fields in MTX303 Log. Below are the descriptions
of the fields of MTX303 which give the actual measure results:
LP_LOSS
- The Loop Loss measured in dB
FN_LOSS
- The Far-to-Near Loss measured in dB
NF_LOSS
- The Near-to-Far Loss calculated in dB (LP_Loss-FN_Loss)
NOISE
- The Loop Noise Level measured in dBrn
Figure 9-6
MRHT Test Output MTX303 Log
Refer to the DualMode 800 Enclosure Troubleshooting Guide, 411-2051-900,
for more information of the fields in MTX303 Log.
Troubleshooting action
If the test fails then it should be repeated for verification. Should the test still
fail the following hardware components may be at fault:
•
TRU (CCH, or VCH)
•
related Power Amplifier(s)
•
Combiner
•
ICRM packs (the AX50s, AX47s, AX87s)
•
T1 transmission equipment used
•
ICP cards (the AX50s)
•
DCSM
The signal may be rerouted to eliminate and pinpoint faulty hardware
components, or the equipment may be swapped one at a time with known
good units and the test repeated. When the test passes the faulty unit may have
been found. Additionally, determine if the MALT or MAHT test has passed or
not to isolate the path failure location further.
MTX303 JUN29 12:12:12 2500 CTT TRANSMISSION TEST
CELL: 20x TEST: MRLT VCH: 10 HW: DRU PASS
PA_EML: -20 dB LP_EML: -20dB TONE: 10 dBm
LP_LOSS: 0.5 dB FN_LOSS: -0.3 dB NF_LOSS: 0.2 dB
NML: 3.0 dB NIAL: 5.0 dB NOISE: 22 dBRN
MTX303 JUN29 12:12:12 2500 CTT TRANSMISSION TEST
CELL: 20x TEST: MRHT VCH: 10 HW: DRU PASS
PA_EML: -20 dB LP_EML: -20dB TONE: 10 dBm
LP_LOSS: 0.5 dB FN_LOSS: -0.3 dB NF_LOSS: 0.2 dB
NML: 3.0 dB NIAL: 5.0 dB NOISE: 22 dBRN
Содержание DualMode 800
Страница 2: ......
Страница 4: ......
Страница 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Страница 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Страница 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Страница 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Страница 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Страница 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Страница 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Страница 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Страница 215: ......