Keep the following in mind when installing DSS Consoles:
A 60-Button DSS Console requires a separate digital station port
when pairing with a digital keyset. For IP terminals, the first console is
connected to the side option slot using a special cable.
Only 1 console can be physically attached to an IP terminal, the
remaining 3 must be hard wired from a TDM port.
When fitted to an IP terminal the DSS console requires it’s own power
supply. PoE is not supported for the DSS console.
Up to 32 different extensions with DSS Consoles can be set up
A single extension can have up to four 60-button DSS Consoles (32
is the maximum allowed per system).
Each DSS console fitted to a TDM port will require a TDM port
license.
5.2.4.1
Installing the DCL-60-1/DCZ-60-2 CONSOLE
1.
Remove both plastic panels from the front of the
multiline terminal.
2.
Turn multiline terminal upside down.
.
Only one DCL-60-1/DCZ-60-2 CONSOLE can be
attached to the DTL/DTZ/ITL/ITZ multiline terminal at
Figure 5-88 DCL-60-1/DCZ-60-2 CONSOLE
To prevent possible damage to the DCL-
60-1/DCZ-60-2 CONSOLE or the DTL/
DTZ/ITL/ITZ multiline terminal during
installation or removal, disconnect the
line cord/LAN cable and the AC/DC
adapter from the DTL/DTZ/ITL/ITZ
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...