![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970178.webp)
Issue 1.2
UNIVERGE SV9100
4 - 24
Installing the SV9100 Blades
RUN (D23) = The CPU is operating (green)
LED D20, and 21 = Alarms (red)
LED D22 = SD Memory Card Access/Alarm indication (red)
LED D25 = The USB memory connection status (red)
(LED off when no USB memory installed)
LED D24 = Not used
Refer to Program 90-10: System Alarm Setup for details on assigning
alarm LEDs.
Table 4-8 GCD-CP10 LED Indications on page 4-24
provides a list of
each LED and associated operation and status indications.
Table 4-8 GCD-CP10 LED Indications
LED Indication
Status
RUN (D23)
D20
D21
D22
D25
Blinking
Off
Off
Off
On Steady When
USB Memory is
Installing
System operating normally
Off
Off
Off
Off
Blinking
Boot is starting
Off
On
Off
Off
Off
Initializing the disk or
formatting
Blinking
Blinking
Off
Access
Blink
On Steady When
USB Memory is
Installing
Boot program is initializing in
the flash memory
Off
On
On
Access
Blink
On Steady When
USB Memory is
Installing
Reading system software
Off
On
Off
Access
Blink
On Steady When
USB Memory is
Installing
Upgrading system software
On
Blinking Blinking Blinking On Steady When
USB Memory is
Installing
Finish formatting (SRAM,
Flash)
Blinking
Off
Off
Off
Off
DRAM error
Blinking
Off
Off
On
On Steady When
USB Memory is
Installing
FPGA version error
Blinking
Off
On
Off
On Steady When
USB Memory is
Installing
SRAM error
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...