Issue 1.2
UNIVERGE SV9100
4 - 6
Installing the SV9100 Blades
The system automatically recognizes each blade installed in the
system.
If a blade has previously been installed
in a slot and another
type of blade is to be installed in that same slot, the blade must first
be removed from the chassis and then the slot definition removed
using Program 90-05 prior to installing the new blade.
This same condition applies to extensions and other devices
connected to the system. For example, if a port was previously used
for a telephone and a DSS Console is to be installed in that same
port, it must first be undefined in Program 10-03 before the console
is connected.
2.2.3
Order of Installing Trunk Blades
2.2.3.1
Installing GCD-4COTA, GCD-4DIOPB, GCD-4ODTB or
GCD-2BRIA blades
The order in which trunk blades are physically inserted
determines the numbering plan.
Table 4-2 Adding Daughter Board to Chassis Example
Initial Blade
Updated Blade
Blade
Slot #
Blade
Extension
Numbers
Blade
Slot #
Blade
Extension
Numbers
1
GCD-16DLCA
200~215
1
GCD-16DLCA
200~215
2
GCD-8DLCA
(no daughter
board)
216~223
2
—
—
3
GCD-16DLCA
224~239
3
GCD-16DLCA
224~239
—
—
—
4
GCD-8DLCA
(with daughter
board)
240~255
To avoid unexpected extension/trunk
numbering if the VoIP or Voice Mail
board registers with the system first,
install these boards after the other types
of extension and trunk blades have been
installed.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...