6 - 18
Installing SV9100 Optional Equipment
6.2
Door Box /External Page Relay Contacts
6.2.1
Connecting a Contact Relay Device to a Door Box/External Page
Relay
To connect a dry contact relay device to a Door Box/External Page
Relay:
To connect to the GCD-CP10:
1.
Connect an RCA line from the CN8 or CN9 connector on the
GCD-CP10 to the appropriate location on the extension cross-
connect block.
2.
Connect the two-conductor station cable from the
cross-connect block to the external relay.
3.
Install bridging clips as required.
OR
1.
To connect to the PGD(2)-U10 ADP:
Make sure the jumper in the PGD(2)-U10 ADP for the channel
is set correctly. (Refer to Figure 6-4
PGD(2)-U10 ADP Jumper
Settings
on page 6-4).
2.
If a line cord was not previously connected to the PGD(2)-U10
ADP, complete Steps 3-6. Otherwise, skip to Step 7.
3.
Install a modular jack for each PGD(2)-U10 ADP. For each
module, run one-pair 24 AWG station cable from the
cross-connect block to a modular jack. Ground the unused pair.
4.
Terminate the extension leads to GRN/RED of the modular
jack. Terminate the unused leads to the jack.
5.
Install bridging clips as required.
6.
Plug a modular line cord from the mod jack to the CN1
connector on the PGD(2)-U10 ADP.
7.
Connect the two-conductor station cable from the CN5
connectors in the PGD(2)-U10 ADP to the external relay.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...