Issue 1.2
UNIVERGE SV9100
4 - 22
Installing the SV9100 Blades
3.
Carefully lift the battery from the socket.
4.
Install the replacement battery .
5.
Install the blade into the chassis and power on the system.
6.
Reset the system (press RESET on the front of the GCD-CP10
blade).
7.
Configure the system clock using the PCPro “Quick Setup”
menu or the command (CM02).
8.
Load the SRAM data saved in step 1, above.
9.
From the PCPro “System Data Save/Load/Verify” menu load
the data from the specified file.
- OAI FLF Memory
Battery replacement is complete.
3.1.2.1
GPZ-IPLE Daughter Board Installation
1.
Install the GPZ-IPLE daughter board, if required.
2.
Ensure the power supply is
OFF
, then slide the GCD-CP10
into Slot 1 in the Controlling Chassis.
3.1.2.2
SD-A1 US/SD-B1 US Installation
1.
Refer to
Figure 4-3 GCD-CP10 Blade Layout on page 4-16
to
install the SD-A1 US or SD-B1 US SD card, if required.
2.
Ensure the power supply is
OFF
, then slide the SD card
(label side up) into the slot until it clicks.
To remove: Carefully push on the SD card until it clicks and
release. Card can be removed from the slot.
3.1.2.3
Background Music (BGM) or Music on Hold (MOH)
1.
If external Background Music (BGM) or Music on Hold
(MOH) is being installed, plug the cable into the AUX1 or
AUX2 pin jack connector on the GCD-CP10. The other end
of the cable plugs into the music source.
o
Refer to the PGD(2)-U10 ADP in Chapter 9, section
2.1
Using a PGD(2)-U10 ADP on page 9-1
for details on
connecting to a music source.
o
When the system software is upgraded, the flash
memory is updated with the new software version. Either
the Hot or Cold start-up method can be used or the
system can be upgraded using system software. Refer to
2.6.1 Performing a Cold Start on page 4-9
,
2.6.2
Performing a Hot Start on page 4-10
, or
2.6.4 Performing
a Software Upgrade on page 4-13
.
o
Customer information is stored in the RAM memory
which is restored after a power failure is cleared. The
lithium battery in the system saves the RAM memory
when power is lost.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...