Issue 1.2
UNIVERGE SV9100
3 - 16
Installing the SV9100 Chassis
1.1.6
Install AC Power Cords on Multiple 19” Chassis (Optional)
To install the AC power cords, locate the supplied AC power cords and
attach to the AC Inlets located on the back of the Controlling and Expansion
Chassis.
1.1.7
Install Additional Blades 19” Chassis
Refer to Chapter 4,
2.1 Installation and Safety Precautions on page 4-3
.
1.1.8
Apply Power to the 19” Chassis
Refer to Chapter 4,
2.6 Powering Up the SV9100 on page 4-9
.
1.2
Installing the 9.5” Base (CHS2UG) Chassis
The CHS2UG chassis have three universal blade slots for station, trunk and
optional blades.
Before proceeding with installation of chassis, ensure site preparation is
completed. The Gateway (CHS2U GW) chassis can be:
m
Wall-mounted – refer to
2.2 Wall Mounting the 9.5” Chassis on page 3-25
.
m
Stand-mounted – refer to
4.2 Stand Mounting the 9.5” CHS2UG B Chassis on
page 3-46
.
The Base (CHS2UG) chassis can be:
m
Wall-mounted – refer to
2.2 Wall Mounting the 9.5” Chassis on page 3-25
.
Figure 3-25 Install 19” AC Power Cords (Multiple-Chassis)
AC Power
Cords to
AC Inlets
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...