Issue 1.2
UNIVERGE SV9100
4 - 94
Installing the SV9100 Blades
A digital signal processor/voice processing section handles the
following functions:
DTMF detection
DTMF generation
General tone detection
Automatic Gain Control (AGC)
Basic Support Package
Each blade installed with the CNF or IVR package accounts for up to
16 Extension Ports of the Total Port capacity (One Conference or
One IVR blade maximum).
6.2.2
Installation
To install the CD-PVAA
Install CompactFlash into CD-PVAA.
Plug the into any universal slot on the chassis.
Refer to Program 10-55-01 to configure the IP Address of the
CD-PVAA.
Refer to Program 10-55-04 to configure the Subnet Mask of the
CD-PVAA.
Refer to Program 10-55-05 to configure the Gateway of the CD-PVAA.
The CD-PVAA blade is hot swappable and can be removed from the
chassis without powering down the blade or the SV9100 system.
When the SV9100 requires system reset, this blade comes back on
line.
6.2.3
Switch Settings
The CD-PVAA blade has the following switches:
LOAD Switch SW3
This switch allows the technician to reset the CD-PVAA without having
to remove and reinsert the blade into the chassis.
6.2.4
LED Indications
Active LED – Green
The Active LED is controlled by the DSP and indicates the board
operational status.
Off: Power off
On: Reset
Slow Flash: Board is running but not in sync with the chassis
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...