UNIVERGE SV9100
Issue 1.2
System Hardware Manual
4 - 21
2.
Push down on the battery, opposite from the plus (+) symbol
(refer to
Figure 4-5 GCD-CP10 Battery Installation
).
Battery Removal
1.
Ensure backup of SRAM data on GCD-CP10
.
When removing the backup battery, SRAM data and system
clock are initialised. Use the following to store the SRAM data
(Reconfigure the system clock after replacing the battery).
2.
Power off the system and remove the GCD-CP10 from the
chassis.
Before removing the GCD-CP10 from the
chassis to install or replace a battery,
ensure the system is powered Off.
When removing the backup battery,
SRAM data and system clock are
initialized. Make a backup of the SRAM in
advance and configure the system clock
after battery replacement.
Replace the battery every 6 years.
Contact the reseller where you bought the
product for a replacement battery.
The following SRAM data types are important
for the client. If stored, this procedure must be
used to restore the data.
Billing memory
SMDR Billing data
Table 4-5 SRAM Data Types
SRAM Data
Measure
Fault Information
Read the fault information using the PCPro “Fault
Display” menu.
OAI FLF Memory
Save the memory by specifying “DBM data (PHS/OAI)”
in the PCPro “System Data Save/Load Verify” menu.
Billing Memory
Print the billing memory using an external printer.
SMDR Billing Data
Delete the billing data using SMDR/CR1000.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...