System Hardware Manual
6 - 1
Chapter
6
Installing SV9100 Optional Equipment
S
ECTION
1
G
ENERAL
I
NFORMATION
This chapter provides information for installing optional equipment, such as
PGD(2)-U10 ADPs, background music, door boxes, DSS consoles,
D
term
VSR, external paging as well as other handsets, recording devices and
adapters on the SV9100 digital and IP telephones.
S
ECTION
2
PGD(2)-U10 ADP
2.1
Using a PGD(2)-U10 ADP
The PGD(2)-U10 ADP provides two circuits which allow connection
to external terminals such as:
Door Box (eight maximum per system)
External Speaker (eight maximum with PGD(2)-U10 ADPs [with
amplifier], one on the GCD-CP10 [no amplifier])
External Music Source (external MOH) (96 maximum per
system)
External Recording System (96 maximum per system)
External Ringing
The system allows a maximum of 56 PGD(2)-U10 ADPs to be
installed (48 for ACI ports [external MOH or external recording
system], four for Door Boxes, and four for Paging). The
PGD(2)-U10 ADPs also provides multi-purpose controls. These
control relays can be used for controlling the external amplifier,
external music source and door lock control with the use of a Door
Box. The system allows for up eight general purpose relays with the
PGD(2)-U10 ADPs (four relays on each PGD(2)-U10 ADP).
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...