![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970431.webp)
UNIVERGE SV9100
Issue 1.2
System Hardware Manual
6 - 19
S
ECTION
7
E
XTERNAL
R
ECORDING
S
YSTEM
/E
XTERNAL
R
INGER
7.1
External Recording System or External Ringer
The PGD(2)-U10 ADP allows the connection of an external recording system
or external ringer. With a customer-provided tape recorder, when an extension
user dials the ACI analog port extension number, they can automatically start
the recorder and activate the record function. When the user hangs up, the
recording stops and the tape recorder turns off. For tape recording, connect
the tape recorder AUX input jack to the PGD(2)-U10 ADP jack. Connect the
recorder control leads (if available) to the CTL (control relay) jack. By using
Department Calling, you can arrange multiple tape recorders into a pool.
When an extension user dials the Department Group pilot number, they reach
the first available tape recorder in the pool.
The relays in the PGD(2)-U10 ADP can optionally control customer-provided
external ringers (loud bells) and buzzers. When an extension user dials the
ACI analog port extension number, the associated PGD(2)-U10 ADP relay
closes and activates the ringer. You could use this capability to control an
emergency buzzer for a noisy machine shop floor, for example. In addition, if
programmed for ringing, an incoming trunk call can activate the ringer/buzzer.
Figure 6-14 GCD-CP10 Page Connections
The relay closes when the Door Box/external
page zone is called. The maximum applied
voltage is 24vDC at .5A for each contact.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...