Blade Capacities
The universal architecture of the UNIVERGE SV9100 provides flexibility
when installing blades. With the exception of the GCD-CP10 blade, any blade
can be installed in any slot.
Table 2-4 Maximum System Capacities – Blades
on page 2-9
(SV9100) provides a list of the blades and the maximum
capacities with various chassis configurations.
2.6
Powering Up the SV9100
2.6.1
Performing a Cold Start
This section describes the process for starting the system for the first
time or starting a system that has been turned off.
To perform a cold start:
1.
Turn the system power off.
2.
Once the system has powered down, push in and hold the
Load
button.
3.
Turn the power switch back on to power the system back up.
With a multi-chassis system, turn on the Expansion Chassis
power supply, then the Controlling Chassis power supply.
4.
Continue holding the
Load
button for approximately three
seconds or until LED 2 starts flashing red.
5.
Release the
Load
button.
6.
When the system has completed reloading the software (two
minutes), the Status LED is flashing on the GCD-CP10.
System software loaded from flash memory and the
customer data is erased from RAM memory.
To avoid extension and trunk renumbering, if certain
blades are recognized first, remove them from their
respective slots until the system has been reset. Then,
slot the blade cards in the correct order to retain the
proper system numbering (Use Program 10-03 prior to
performing a cold start to record the current slot
definitions.).
IMPORTANT CONSIDERATIONS
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...