![background image](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_hardware-manual_3936970182.webp)
Issue 1.2
UNIVERGE SV9100
4 - 28
Installing the SV9100 Blades
need to be connected to a conventional PCM-based digital circuit,
this board converts the IP packet signal into a PCM signal format and
connects to the PCM time division switch.
The GPZ-IPLE daughter board is required for IP telephones to
communicate with non-VoIP UNIVERGE SV9100 telephones, and
place or receive outside calls.
The VoIP daughter board provides the voice (RTP/RTCP)
processing function. The call control function is mounted on the
CPU.
The VOIPDB daughter board provides:
256 (GPZ-IPLE) channels
When installing a IPLE Daughter board, the system allocates the
maximum number of trunk ports for the blade being installed.
This daughter board is installed on the GCD-CP10.
3.2.2
Installation
To install a GPZ-IPLE on the GCD-CP10 :
1.
With the system power off, remove the GCD-CP10.
2.
Install the IPLA Daughter board onto the GCD-CP10 blade.
3.
Insert the GCD-CP10 into slot 1 in the Controlling Chassis or.
.
Refer to
Figure 3-3 19” Controlling Chassis – Guides Slot 1 on page
3-3
for more details.
4.
Connect the IPLE Daughter board to the CD-RTB or to an
external switching hub using an ethernet cable.
3.2.3
Switch Settings
These daughter boards do not have any switches that need to be set
and do not require any hardware setting.
3.2.4
LED Indications
LED indications for the GPZ-IPLE Daughter Boards are indicated in
Table 4-12 IPLE Daughter Board LED CN1 Transmit/Receive Data
Indications
. Each LED is listed with its associated function and LED
Do not remove or install the GCD-CP10 with the
power on.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...