UNIVERGE SV9100
Issue 1.2
System Hardware Manual
4 - 103
6.4.2.2
GCD-CP10IP Address Assignment
The GSWU Main board will be provided with an IP address
from the back plane CPU during the initialization sequence.
The provision of an IP address from the back plane will
identify the Main board. If during initialization, the IP address
is set to
0
by the CPU, the blade is then determined to be an
Add-on
.
The IP address for the GSWU is assigned in Program 10-55
on the system. It contains the settings for the IP Address,
Subnet Mask and Gateway IP Address.
6.4.2.3
Group Formation
When a GSWU determines that it is an
Add-on
board due to
the lack of an IP address from the backplane, it sends a
broadcast P2P message (defined in separate
documentation) to all the GSWU units in the system until it
receives an acknowledge message from the Main board.
The Main board receiving this broadcast message will
acknowledge by sending port identification information to
the Add-on board.
6.4.2.4
Port Number Determination
When a Main board is initialized, the board assigns the first
eight ports as port 1 ~ 8. When subsequent Add-on boards’
broadcast messages are received, the Main board assigns
port numbers on a first come, first serve basis.
.
To have deterministic port assignment, it is recommended the
the Add-on boards be inserted sequentially starting with the
desired lower port numbers first.
When a board is removed, the port numbers are not
automatically removed. The operator, however, can remove
any assignment by accessing the Main board GUI.
Example:
Main board is inserted in slot 3, one Add-on board inserted
in slot 5. Main board has ports 1 ~ 8; Add-on board has
ports 9 ~ 16.
1. User inserts a new Add-on board in slot 2.
The new board gets assigned ports 17 ~ 24.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...