UNIVERGE SV9100
Issue 1.2
System Hardware Manual
- iii
___________________________________________________________________________________
___________________________________________________________________________________
System Hardware Manual
iii
___________________________________________________________________________________
1.1.2.4
Connect the Controlling and Expansion Chassis ...............3-11
1.1.3 Install Grounding on 19” Chassis .............................................3-13
1.1.4 Install Grounding on Multiple 19” Chassis (Optional) ...............3-14
1.1.5 Install AC Power Cords on 19” Chassis ...................................3-15
1.1.6 Install AC Power Cords on Multiple 19” Chassis (Optional) .....3-16
1.1.7 Install Additional Blades 19” Chassis .......................................3-16
1.1.8 Apply Power to the 19” Chassis ...............................................3-16
1.2
Installing the 9.5” Base (CHS2UG) Chassis .............................. 3-16
1.2.1 Install Grounding on 9.5” Chassis ............................................3-17
1.2.2 Install AC Power Cord 9.5” Gateway or Base Chassis ............3-18
1.2.3 Install Additional Blades 9.5” Gateway or Base Chassis .........3-18
1.2.4 Apply Power to the 9.5” Gateway or Base Chassis .................3-18
1.3
Installing the 9.5” Chassis ......................................................... 3-18
Section 2 Wall Mounting the Chassis .......................................................3-18
2.1
Wall Mounting the 19” (CHS2UG) Chassis ............................... 3-18
2.1.1 CHS2UG Chassis Wall Mount Installation ...............................3-18
2.2
Wall Mounting the 9.5” Chassis ................................................. 3-25
2.2.1 Option 1 – Wall Mounting the 9.5 inch (CHS2UG) Chassis .....3-25
2.2.2 Wall Mounting the 9.5 inch (CHS2UG) Chassis ......................3-27
2.2.2.1
Wall Mounting the CHS2UG without the CHS2UG B Small Batt
Box 3-29
2.2.2.2
Wall Mounting the CHS2UG with the CHS2UG B Small Batt Box
3-31
Section 3 Floor Mounting the Chassis .....................................................3-36
3.1
Floor Mounting the 19” (CHS2UG) Chassis .............................. 3-36
3.1.1 CHS2UG Chassis Installation ..................................................3-36
3.1.2 Multiple CHS2UG Chassis Installation .....................................3-39
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual Issue 1 2 January 2015...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...Issue 1 2 UNIVERGE SV9100 1 16 Introduction to SV9100...
Страница 44: ...Issue 1 2 UNIVERGE SV9100 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 100: ...Issue 1 2 UNIVERGE SV9100 3 28 Installing the SV9100 Chassis Figure 3 36 Anchor Bolt from Wall 9 5 Chassis...
Страница 105: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 3 33 Figure 3 42 Brackets Small Batt Box...
Страница 154: ...Issue 1 2 UNIVERGE SV9100 3 82 Installing the SV9100 Chassis...
Страница 185: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 31 Figure 4 8 Connecting a IPLA Daughter Board to a Network PC...
Страница 199: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 45 Figure 4 12 Installing the GPZ 4LCA Daughter Board...
Страница 239: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 85 Figure 4 24 Control Signal Connection...
Страница 259: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 4 105 NOTES...
Страница 260: ...Issue 1 2 UNIVERGE SV9100 4 106 Installing the SV9100 Blades...
Страница 325: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 5 65 Figure 5 57 Sticker Braille L KIT Sheet 2...
Страница 412: ...Issue 1 2 UNIVERGE SV9100 5 152 Installing DT Series Digital and IP Multiline Terminals...
Страница 418: ...Issue 1 2 UNIVERGE SV9100 6 6 Installing SV9100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 425: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 426: ...Issue 1 2 UNIVERGE SV9100 6 14 Installing SV9100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 438: ...Issue 1 2 UNIVERGE SV9100 6 26 Installing SV9100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 475: ...UNIVERGE SV9100 Issue 1 2 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on GCD 4COTA Blade...
Страница 476: ...Issue 1 2 UNIVERGE SV9100 6 64 Installing SV9100 Optional Equipment...
Страница 477: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...