•
Place the camshaft with the gear seat
on the dowel side.
•
Insert and tighten the shim washer.
•
Place the U-bolt on the camshaft mak-
ing sure the two reference pins match
the seats on the cam tower.
•
Tighten the four screws operating di-
agonally and in stages.
OPTION 02 - ROLLER TIMING SYSTEM
•
Insert the roller hydraulic tappets mak-
ing sure that the roller (1) in the appro-
priate milling (2) of the cam tower
coincides.
Engine
Stelvio 1200 NTX MY11
ENG - 204
Содержание Stelvio 1200 MY11 2011
Страница 1: ...SERVICE STATION MANUAL B043090 Stelvio 1200 NTX MY11 ...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Страница 54: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Страница 61: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Страница 72: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Страница 133: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Страница 146: ...INDEX OF TOPICS ENGINE ENG ...
Страница 147: ...Gearbox Diagram key 1 Ball bearing Stelvio 1200 NTX MY11 Engine ENG 147 ...
Страница 255: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Страница 267: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Страница 295: ...INDEX OF TOPICS CHASSIS CHAS ...
Страница 326: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Страница 356: ...INDEX OF TOPICS BODYWORK BODYW ...
Страница 378: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...