6.1) BDT2 SLIDE PULL ARM
a)
Insert the M8 x 70 screw (2) in the tapered pin (1)
b)
Insert the sliding arm (3) in the closed shell (4)
c)
Insert the tapered pin (1) above the sliding arm (3), through the closed shell (4)
d)
Strongly tighten the M6 x 30 screws (5) to block the sliding arm (3) on the tapered pin (1)
e)
For the assembly of the sliding guide, see paragraph 6.3
f)
The pin (6) must be inserted in the sliding guide runner
6.2) BSG 150/ BSG 250 ELBOW SLIDING ARM
a)
Insert the M8 x 70 screw (2) in the tapered pin (1)
b)
Insert the long rod of the arm (4) in the closed shell (3)
c)
Insert the tapered pin (1) above the long rod of the arm (4), through the closed shell (3)
d)
Strongly tighten the screws M6 x 30 (5) to block the long rod of the arm (4) on the tapered pin (1)
e)
Insert the rods, long (4) and short (6) in the bush (7) and fasten them with the M10 x 6 screws (8)
f)
For the assembly of the sliding guide, see paragraph 6.3
g)
The pin (9) must be inserted in the sliding guide runner
6) MOVEMENT TRANSMISSION ARMS
12
Содержание Neptis SMP
Страница 8: ...5 TECHNICAL DRAWINGS 8 ...
Страница 9: ...9 ...
Страница 10: ...10 At door open a mechanical end stop has to be installed ...
Страница 11: ...11 At door open a mechanical end stop has to be installed ...
Страница 17: ...17 8 SELECTING THE OPENING DIRECTION IN FUNCTION OF ARM ...