Getting familiar with the machine
26
Display of the sections in the
main screen
The active sections are displayed in black triangles in the main screen
for both sides:
•
The working width of 78 ft is divided into 2 x 6 sections of 6.5 ft. and
controlled by the GEOCONTROL.
If the working width cannot be divided into sections of 6.5ft, the two
centre-most sections are wider. A working width of 25 ft. gives two
centre-most sections of 7 ft.
The working width reduction per section is displayed in the main
screen by leaving out a part of the triangle at a time and displaying the
new working width.
•
2 sections are closed here to the left.
Shown in the GEOCONTROL
screen:
The GEOCONTROL screen also displays the section of activities in a
bar below the screen.
I
NDICATION
Check the accuracy of the discharge point letter setting by conducting
a spreading pattern test (tray test).
See paragraph »Spreading pattern check (tray test)« on page 78.
I
NDICATION
Take note of the exact driving distance and make sure there are
tramlines.
If you want to change the application rate or change to another
fertilizer type (with similar working width and driving speed), you only
have to enter a new flowrate starting value and relevant dosing setting
and adapt the discharge point letter setting, if required.