Ch.2 Unpacking and Installation
< 49 >
DRYPRO MODEL 771 INSTALLATION MANUAL Ver.1.00 2003.10
1
Make sure that the power breaker located in the
lower left of the jam release-port cover.
3
Connect the power cable to the outlet (3P) of the
facility.
ON
OFF
2
Connect the power cable of the UPD to the
power connector located in the lower left of the rear
panel of DRYPRO 771.
5
Press and hold the operation switch located on the
upper left of the left cover.
• Initialization takes place, and message "FILM
EMPTY!!" is displayed alternately with "PRESS
RESET/OPEN" together with a beep sound
• Then install the films in the DRYPRO 771.
14x17 B S:000 Q:000.
PRESS RESET/OPEN
Alternately displayed
14x17 B S:000 Q:000.
FILM EMPTY!!
When 3P plug is not available, connect to the power outlet using a "3P-2P" adapter.
In this case, make sure that the GND wire of the adapter is grounded to the GND
terminal of the facility.
Do not connect the ether
cable at this point.
Ether cable should be
connected after completing
all settings necessary for
DRYPRO 771.
4
Turn on the power breaker located in the lower left
of the jam release-port cover.
ON
OFF
2.6
Start Up
After completing the removal and installation of specified parts, start up the DRYPRO 771.
2.6.1 Turning ON the Power
Turn on the power of the DRYPRO 771.
Содержание DRYPRO 771
Страница 10: ...Preface 8 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 26: ...Ch 1 Before Installation 24 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 54: ...Ch 2 Unpacking and Installation 52 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 82: ...Ch 4 Checking the Image 80 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 96: ...Ch 4 Checking the Image 94 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...