Ch.1 Before Installation
< 10 >
DRYPRO MODEL 771 INSTALLATION MANUAL Ver.1.00 2003.10
1.1
Installation Work Flow
In order to ensure the smoothest possible work flow, tasks should be carried out in the sequence shown
below.
Preparations
Installation
Unpacking
· Installation conditions check
· Network check
· Tool preparation
Removal of protective materials (red components)
Installation of deodorant filter
Installation of UPS battery (recommended).(option)
Install an exhaust duct, cable protection parts. (option)
Check of film size to be used
Connection of power supply and network cables
Changing tray film size
14x14
14x11
14x17
Making Settings
Starting up the DRYPRO 771
Making DRYPRO 771 settings (SCP) "S00"
Making settings on connected diagnostic devices (SCU) "S10"
Making other settings "S20," "S30," "S40"
Density correction
Settings user LUTs
Checks
Test Printing
Содержание DRYPRO 771
Страница 10: ...Preface 8 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 26: ...Ch 1 Before Installation 24 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 54: ...Ch 2 Unpacking and Installation 52 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 82: ...Ch 4 Checking the Image 80 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...
Страница 96: ...Ch 4 Checking the Image 94 DRYPRO MODEL 771 INSTALLATION MANUAL Ver 1 00 2003 10...