284
381298/C
connect the uninterruptible power supply to AC
mains and vessel ground ............................ 138
connect the USB interface cable from the
Operating Panel to the Processor Unit............. 145
connect the video cable ............................... 143
connect vessel ground and AC mains to
display ........................................... 141, 143
connect vessel ground to computer.................. 139
connect vessel ground to Enix computer ........... 139
connect vessel ground to Processor Unit ........... 139
define the file and folder preferences for data
recording............................................... 202
define the location of the GPS ....................... 198
define the location of the motion reference
unit ..................................................... 197
define the location of the transducer ................ 199
define the sonar reference point...................... 195
design, manufacture and mount the installation
blister..................................................... 91
design, manufacture and mount the installation
hardware ................................................. 91
design, manufacture and mount the keel box ........ 91
design, manufacture and mount the sealing
plate ...................................................... 95
design, manufacture and mount the steel
conduit ................................................... 92
determine the location and installation angles
of the transducer ........................................ 88
install the computer.................................... 118
install the display ...................................... 117
install the Enix ......................................... 118
install the mounting house.............................. 96
install the Operating Panel............................ 120
install the Operating Panel Power Supply .......... 122
install the Processor Unit ............................. 118
install the transceiver .................................. 123
install the Transceiver Unit ........................... 123
install the transducer................................... 106
install the transducer cables .................... 102, 104
install the transducer into the mounting
house ................................................... 106
interface a motion sensor ............................. 208
lift the transducer up to its mounting
location ................................................ 100
lift units and transportation boxes ................... 257
mount the transducer .................................. 106
pack for storage or shipment ......................... 266
power off ................................................ 215
power up ................................................ 189
prepare a cable for termination....................... 174
prepare the transducer installation..................... 88
pull the transducer cable through the steel
conduit ................................................. 104
pull the transducer cables through the sealing
plate .................................................... 102
return electronic modules to Kongsberg
Maritime ............................................... 272
return printed circuit boards to Kongsberg
Maritime ............................................... 272
secure and terminate a cable.......................... 175
select measurement units ............................. 194
set to work .............................................. 179
set up input from a navigation system .............. 204
set up synchronization................................. 209
transport Kongsberg Maritime equipment.......... 256
troubleshoot when the Transceiver Unit fails to
start ..................................................... 191
unpack a hydrophone.................................. 264
unpack a mechanical unit ............................. 262
unpack a sonar head ................................... 264
unpack a transducer.................................... 264
unpack an electromechanical unit ................... 263
unpack an electronic unit ............................. 263
unpack and handle electronic modules.............. 270
unpack and handle printed circuit boards........... 270
unpack standard parts and units...................... 261
unpack the transducer ................................... 98
use multi-diameter cable sealing............... 108, 176
verify basic operation ................................. 190
verify that all cables are properly connected ........ 182
verify that operational power is correct............. 181
visual inspection of units and transportation
boxes after arrival .................................... 258
requirements ............................................ 253
unpacking ............................................... 264
I
cable requirements..................................... 172
line socket............................................... 160
if something breaks down .............................. 12
power off .................................................. 12
reminders.................................................. 12
switch off ................................................. 12
transducer handling............................. 12, 23, 65
when not in use........................................... 12
when you are docking your vessel..................... 12
information
high voltage......................................... 31, 276
support .................................................... 36
motion sensor........................................... 208
transportation boxes ................................... 258
units...................................................... 258
purpose .................................................... 15
display ................................................... 117
drawings................................................... 10
Enix ...................................................... 118
hardware units.......................................... 116
instructions ................................................ 9
overview .................................................. 39
planning ................................................... 38
preparations............................................... 38
procedures ................................................ 88
Processor Unit.......................................... 118
remarks .................................................. 216
requirements for installation personnel ............... 41
summary .................................................. 39
summary of transducer installation.................... 65
tasks ....................................................... 39
transceiver .............................................. 123
Transceiver Unit ....................................... 123
Simrad SN90
Содержание Simrad SN90
Страница 2: ......
Страница 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Страница 226: ...224 381298 C 427 385 All measurements in mm The drawing is not in scale 385609 Rev B CD12_385609_001_002 Simrad SN90 ...
Страница 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Страница 295: ......
Страница 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Страница 297: ......