278
381298/C
Equipment responsibility
Unless otherwise stated in the contract, the shipyard doing the installation and/or
equipment dealer becomes fully responsible for the equipment upon receipt.
The duration of responsibility cover:
• The period of time the equipment is stored locally before installation
• The entire installation process
• Commissioning
• The period of time between commissioning and the final acceptance of the equipment
by the end user or owner
Unless other arrangements have been made in the contract, the Simrad SN90 guarantee
period (as specified in the contract) begins when the acceptance documents have been
signed.
Related topics
Equipment handling, page 255
General supply conditions, page 277
Receipt, unpacking and storage, page 277
Simrad SN90
Содержание Simrad SN90
Страница 2: ......
Страница 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Страница 226: ...224 381298 C 427 385 All measurements in mm The drawing is not in scale 385609 Rev B CD12_385609_001_002 Simrad SN90 ...
Страница 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Страница 295: ......
Страница 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Страница 297: ......