
SERVICE INFORMATION 00 – 43
needle position of water thermomete, conduct a
5 minutes idling again and stop the engine.
10 When the engine has been cooled, check filler neck
for water level and replenish if required. Should
extreme shortage of coolant is found, Check the
coolant system and reservoir tank hose for leakage.
11 Fill the coolant into the reservoir tank up to “MAX”
line.
Cooling System Inspection
Install a radiator filler cap tester to the radiator. Apply testing
pressure to the cooling system to check for leakage.
The testing pressure must not exceed the specified pressure.
Testing Pressure
kPa (Kg/cm
2
/psi)
147 (1.5/21)
Radiator Cap Inspection
The radiator filler cap is designed to maintain coolant
pressure in the cooling system at 1.05 kg/cm
2
(15 psi / 103
kPa). Check the radiator filler cap with a radiator filler cap
tester. The radiator filler cap must be replaced if it fails to
hold the specified pressure during the test procedure.
Radiator Filler Cap Pressure
Pressure Valve
kPa (Kg/cm
2
/psi)
88 - 118 (0.9 - 1.2/12.8 - 17.1)
Negative Valve (Reference)
kPa (Kg/cm
2
/psi)
1.0 - 13.9 (0.01 - 0.04/0.14 - 0.57)
Thermostat Operating Test
1. Completely submerge the thermostat in water.
2. Heat the water.
Stir the water constantly by suitable wood bar (2) to
avoid direct heat being applied use wood plate (3) to
the thermostat.
3. Check the thermostat initial opening temperature.
Thermostat Initial
Opening Temperature
°C (°F)
82 (180)
4. Check the thermostat full opening temperature.
Thermostat Full
Opening Temperature
°C (°F)
95 (203)
Valve Lift at Fully Open Position
mm (in)
10 (0.39)
0042-2.tif
0042-3.tif
0042-4.tif
Содержание NHR 4J Series
Страница 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Страница 2: ...MEMO...
Страница 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Страница 59: ...SERVICE INFORMATION 00 55 Intake Manifold Exhaust Manifold Exhaust Pipe N m kg m lb ft 150LX004 tif...
Страница 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Страница 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Страница 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Страница 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Страница 67: ...SERVICE INFORMATION 00 63 MEMO...
Страница 137: ...6A1 2 4JB1 4JB1T 4JB1TC 4JG2 ENGINE GENERAL DESCRIPTION 4JB1 TC 6A1 2 1 tif F06LX002 tif F06LX005 tif...
Страница 151: ...6A1 16 4JB1 4JB1T 4JB1TC 4JG2 ENGINE 1 PCV Hose Connect the PCV hose to the intake pipe Connect battery ground cable...
Страница 325: ...6C 66 ENGINE FUEL MEMO...
Страница 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Страница 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Страница 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Страница 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Страница 367: ...6D3 22 CHARGING SYSTEM MEMO...
Страница 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Страница 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Страница 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Страница 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Страница 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Страница 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Страница 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Страница 393: ...6F 6 ENGINE EXHAUST MEMO...
Страница 406: ...No HGSTG WE 661 PRINTED IN JAPAN...